Indexes

Message Layouts
Session
PreTrade
Trade
PostTrade
Infrastructure

Field

LegProvisionOptionExercisePeriodSkip

ID (tag)40488
Typeint
PedigreeAdded EP161
The number of periods in the referenced date schedule that are between each date in the relative date schedule. Thus a skip of 2 would mean that dates are relative to every second date in the referenced schedule. If present this should have a value greater than 1.

Orchimate Copyright 2026 Atomic Wire Technology Limited
Orchestra Copyright 2026 FIX Protocol Ltd
Terms of Use|Privacy Policy