Field
OptionExerciseSkip
| ID (tag) | 41130 |
| Type | int |
| Pedigree | Added EP169 |
The number of periods in the referenced date schedule that are between each date in the relative date schedule. Thus a skip of 2 would mean that dates are relative to every second date in the referenced schedule. If present this should have a value greater than 1.
Used in components:
Orchimate Copyright 2026 Atomic Wire Technology Limited
Orchestra Copyright 2026 FIX Protocol Ltd
Terms of Use|Privacy Policy