Indexes

Message Layouts
Session
PreTrade
Trade
PostTrade
Infrastructure

Field

UnderlyingOptionExerciseSkip

ID (tag)41834
Typeint
PedigreeAdded EP169
The number of periods in the referenced date schedule that are between each date in the relative date schedule. Thus a skip of 2 would mean that dates are relative to every second date in the referenced schedule. If present this should have a value greater than 1.

Used in components:

Orchimate Copyright 2026 Atomic Wire Technology Limited
Orchestra Copyright 2026 FIX Protocol Ltd
Terms of Use|Privacy Policy